Monthly electric facilities technology (2019)
The latest issue table of contents contents [December issue] special feature latest datacenter
November, 2019 issue
2019 11 issue
Special feature lighting control and next-generation light Product number:2019年11月号 No.804 |
|
Lighting control and next-generation light
October, 2019 issue
2019 10 issue
Dangerous materials setting permission application accompanied with the generator setting for the special feature emergency Product number:2019年10月号 No.803 |
|
As large-scale disaster and BCP measures, I come to often plan driving for the long time of the emergency generator.
As the large emergency generator uses fuel oil A as fuel, I install the fuel tank which I buried in the basements as driving measures for a long time. When capacity such as the fuel oil A stored to the fuel tank exceeds the designated amount of dangerous materials in the Fire Services Act, dangerous materials bank setting permission application is necessary. In addition, the dangerous materials handling place setting permission application is necessary when the fuel consumption of the emergency generator exceeds the designated amount of dangerous materials. The electric equipment person in charge rarely experiences the setting permission application of dangerous materials and will need great time for documents making as prior consultation and the application procedure with the fire department are complicated. Furthermore, about the inspection of dangerous materials about fuel tank of the undergrounding under the ground, there is much inspection before the completion inspection including the intermediate inspection of the structure body of the tank room, the in front of completion inspection inspection (I include an application) of the tank body and the acceptance inspection.
If by publishing features about the process control until an examination of documents making and completion accompanied with the setting of dangerous materials this time, is helped the electric equipment person in charge, I am happy.
September, 2019 issue
2019 9 issue
The front line of the special feature battery technology Product number:2019年9月号 No.802 |
|
I reported the state-of-the-art of the storage technology that was essential to system stabilization of the electricity with the April, 2018 issue in the process that renewable energy increased about "a storage technology of the electricity energy". The fifth basic engery plan was devised in May, and a long-term policy to 2050 was shown again. A design toward the future to super smart society of Societty5.0 where I advanced from the changes from industrialized society of Societty3.0 where we are placed in to the Societty4.0 information-oriented society to more is shown now here. I control it, and it is intended to take the supply-demand balance of the most suitable energy by communications networks such as 5G where a change element is deployed to in future while securing a power supply becoming the base. You touch it about an approach to save electricity to become the pivot in keeping the balance from such a point of view, and to adjust it to, and what kind of battery technology is as of now, or please explain it.
I had you explain it about the development trend of the battery in two chapters about the Societty5.0 super smart social way by this special feature in Chapter 1 in the next generation. Lithium battery that demand was increasing most and nadonitsuite touched it in four chapters in three chapters about basics of the battery and UPS which I used. I had you explain it about proof experiment demand response DR, virtual power plant VPP which were a transition period in forming smart society in five or six chapters. I have you speak the disposal, the recycling of the rechargeable battery which is rapidly increasing by the spread of EV in future in seven chapters. I had you mention concrete content about an examination matter accompanied with the UPS update of the real datacenter in nine chapters about a characteristic of UPS using the lithium ion battery in eight chapters.
About the technique described this time, there is the thing of the course of the development, but I have it continues and watch it closely and want you to deepen recognition as a technique to prop up future IoT society.
In a special feature
August, 2019 issue
2019 8 issue
Special feature JECA FAIR 2019 67th electric facilities industry exhibition Product number:2019年8月号 No.801 |
|
Special feature JECA FAIR 2019 67th electric facilities industry exhibition
Introduction of the 58th product contest receiving a prize product
・The Minister of Land, Infrastructure and Transport Prize
LP gas engine generator (3kVA) for the disaster prevention
Kandenko Co.,Ltd.
・The Minister of Economy Trade and Industry Prize
Electric discharge detection unit
Nitto Electric Works, Ltd.
・The Minister of the Environment Prize
On-site EL measurement service
Toenec Corp.
・(Germany) worker health security mechanism labor security hygiene research institute's director Prize
Live wire sheath bad insulation point measuring equipment LILIA-150T
Fujikura Dia Cable
・(ground Germany) Tokyo Metropolitan industry Research and Development Center's director Prize
POWER CAGE CLAMP® high current terminal stand
wagojapan
・Association of Kanto electricity preservation's director Prize
Image recognition application "Pitos" (Pete's)
Toko Electrical Construction
・Association of NIPPON DENSETSU KOGYO's chairperson Prize
Plug in form UPS
TOSHIBA infrastructure systems
・Association of NIPPON DENSETSU KOGYO prize for encouragement
Securing of minimum charge quantity type EV battery charger control system "Smart EV Charger"
Kawamura Electric Inc.
・Association of NIPPON DENSETSU KOGYO prize for encouragement
AC/DC clamp meter CM4376
HIOKI E.E.
・Association of NIPPON DENSETSU KOGYO prize for encouragement
Illumination measurement robot
Kinden Corp.
・Association of NIPPON DENSETSU KOGYO prize for encouragement
den gong ball series
Vessel
・Association of NIPPON DENSETSU KOGYO prize for encouragement
Electric equipment periodic inspection test device KEW 6206
Kyoritsu Electrical Insturments Works
・Association of NIPPON DENSETSU KOGYO prize for encouragement
TOLSO series BeAm Free (torso series beam-free)
Panasonic
On seeing a JECA FAIR 2019 - 67th electric facilities industry exhibition―
Preface
Committee chief examiner Kazuhiro Hayashi specialized in this magazine editing
1 high pressure, low-pressure apparatuses
This magazine editing specialty committee member Kazumasa Sakamoto
2.Control units
This magazine editing specialty committee member Kazumasa Sakamoto
3.Electric wires
Committee member Koji Takahashi specialized in this magazine editing
4.Wiring appliance, wiring materials, switchboard
This magazine editing specialty committee member Koji Unomoto
5.Electric wire protection materials
Committee member Yasuji Mori specialized in this magazine editing
6.Lighting equipment
This magazine editing specialty committee member Masayuki Hatakeyama
7.Disaster prevention apparatus
This magazine editing specialty committee member Hiroki Ikeda
8.Information and communication system
This magazine editing specialty committee member Junichi Kondo
9.Multiplication, CAD system
This magazine editing specialty committee member Atsushi Sato
10. Measure, instruments
This magazine editing specialty committee member Yosuke Tokieda
11. Tool, protective gears
This magazine editing specialty committee member Kazuki Yoshizumi
Serialization
Progress of the mountain climbing of spare time witty saying 434th me
Committee member T.S. specialized in this magazine editing
I got a qualification in this way
―- 29 that I get the qualification even if busy
Sanki Engineering Co.,Ltd. Masahiro Nozawa
I look at the building walk whole country of the cultural heritage and walk
It is old station building A.S gijutsushijimushokaku* among 67
Essay
Trip to electric facilities memoirs 207th Malaysia (1 miscellaneous thought)
Moriyama professional engineer office Shigeru Moriyama
Starting farming for the year Episode 8 of electric facilities archeology grounding and the thunder protection
Western-influenced architecture architecture and lightning rod ... others building - Nippon Chiko Takashi Shoda person
New product introduction
Administrative movement
Intake of orders findings (for April, 2019) of the electrician business
Building start of construction floor space of total demand electric energy, May, 2019 of March, 2019
Material news
Electric facilities-related new book information
Exhibition guide
Visiting Web sites (the 207th)
Association of Web analysis person
List of electric facilities-related magazine main pivot articles
The industry brief correspondence
A cover photograph: Kandenko Co.,Ltd., Nitto Electric Works, Ltd., Toenec Corp.
July, 2019 issue
2019 7 issue
A special feature: The latest yard information and communication, low current facilities Product number:2019年7月号 No.800 |
|
Electricity facilities, the power equipment is heart and muscle if they compare it to people, and it is brain and a nerve, and the yard information and communication, the low current facilities are the five senses such as eyes or the ear. Electricity facilities, the power equipment contributes to building value as strength of facilities. The communication facilities continue providing new service with high convenience by increase of the recent information and increase, low cost of the ability for information processing, and the technological change is remarkable. However, it increases for we industry to depend on a maker and the specialized construction company of the latter facilities and has been become the flight recorder. Therefore an emphasis is placed in wiring classification or the route between the apparatus about a case and the construction that a design condition is not arranged enough in the design, and accumulation of the knowledge seems to be lack for more information about a system.
I had you added the places that wanted the design and construction side to consider it in particular more such as makers with getting more specialized knowledge about the yard information and communication, low current facilities by this special feature and explain it.
June, 2019 issue
2019 6 issue
A special feature: Quality and obstacle of the power supply Product number:2019年6月号 No.799 |
|
It is this magazine editing specialty committee member Miku Murata, Shigeyoshi Sakai in a special feature
The item which was defined as quality of the one chapter electricity
This magazine editing specialty committee member Miku Murata
A factor and a principle to reduce quality judging from the supply side of the two chapters electricity and measures
About a 2-1 voltage change and a frequency change
[1] Frequency change to occur by disproportion of the supply and demand
Central Res. Inst. of Electric Power Industry Hiroyuki Amano
[2] Voltage control by the reactive power in the distribution system
Central Res. Inst. of Electric Power Industry Satoshi Uemura
[3] Characteristic change of the induction motor when the voltage, a frequency fluctuated
Yasukawa automation drive Takeshi Sakamoto, Yaskawa Electric Corp. Odo group way
It is Nichicon Corp. about a 2-2 voltage distortion
It is Tokyo Electric Power power grid about a 2-3 second voltage drop
Flicka outbreak mechanism with the 2-4 PV system
Sumitomo Densetsu Co.,Ltd. Yasuhisa Gomi
An outbreak principle and influence of the 2-5 voltage disequilibrium
Toenec Corp. Yu Fujita, Hiroshi Kobayashi
Influence and measures by the quality aggravation judging from the consumers side of the three chapters electricity
Influence on 3-1 control equipment Omron Corp. Michihiro Yamamoto of the power supply quality deterioration
It is Sumitomo Densetsu Co.,Ltd. Yuichi Yoshida about 3-2 voltage dip shops well
About 3-3 voltage disequilibrium
[1] Characteristics Chubu University Hiroshi mound success of the ministry of three induction motor under the disequilibrium voltage
[2] Measures example to the voltage disequilibrium Toenec Corp. Yu Fujita, Hiroshi Kobayashi
Influence on lighting equipment this magazine editing specialty committee member Miku Murata of 3-4 Flicka
Outbreak and the antenna effect of the four chapters noise and measures
It is Fujita professional engineer office Yoshimi Fujita with the antenna effect of the 4-1 electrical conductor
A 4-2 noise disorder and measures example (a noise trouble and measures of the X-rays CT device)
denkenseikikenkyushoheidengenni
It is Fujita professional engineer office Yoshimi Fujita with the 4-3 electromagnetic environmental compatibility (EMC)
A shield (cover) and twist line as 4-4 noise measures
Fujita professional engineer office Yoshimi Fujita
Noise measures Fujita professional engineer office Yoshimi Fujita of the cable wiring for the 4-5 electricity instrumentation
Usage Fujita professional engineer office Yoshimi Fujita of a noise and the filter of the 4-6 power supply line
Fujita professional engineer office Yoshimi Fujita of a 4-7 LAN wiring standard and the construction concerned
Technical promotion
I hold all Toenec Corp. 28th company technology research presentations
Toenec Corp. Mio Takatsu
Exhibition report
From LIGHTING FAIR 2019 (the 14th international lighting synthesis exhibition)
Manabe professional engineer office Shizuo Manabe, Miyata energy management person office Shigekazu Miyata
On seeing SECURITY SHOW 2019 (the 27th security, safety management synthesis exhibition)
Manabe professional engineer office Shizuo Manabe
Serialization
The spare time witty saying 432nd cherry blossoms and coat (the flower gets cold)
Committee member diver specialized in this magazine editing
- - 27 that I get the qualification even if busy that I did it this way and got a qualification
Kandenko Co.,Ltd. Kiyoshi Kaneko
―The article third to become - mind that an editing committee member chose
Introduction example of solar power plant wind damage measures
Hokuriku Electrical Construction Co.,Ltd. Kazuki Imai, ubikoki
Academic conference, the association introduction third Japan snow Japan Federation of Engineering Societies
Tohoku Electric Power Co., Inc., Japanese snow Japan Federation of Engineering Societies Shinji Okuda
Essay
Starting farming for the year of electric facilities archeology grounding and the thunder protection
The law in conjunction with the lightning rod of the Episode 6 Meiji era
Nippon Chiko Takashi Shoda person
Is the electric facilities memoirs 205th late-blooming?
Moriyama professional engineer office Shigeru Moriyama
Look at the building walk whole country of the cultural heritage, and walk; 66
Yamagata Prefectural museum education museum (former Yamagata normal school Main Building)
A.S gijutsushijimushokaku*
A cover photograph: Omron Corp., Toenec Corp., denkenseikikenkyusho, photo library offer
May, 2019 issue
2019 5 issue
A special feature: State-of-the-art of the skyscraper Product number:2019年5月号 No.798 |
|
In the times of the bubble, the future plans such as 100-story super high-rise buildings were announced by Japanese various construction companies. It might have done not come to come true, but these were very attractive for oneself.
In late years plans such as surpassing 1,000m are going in the foreign countries, and it is not 1,000m grade in Japan, but the plan of the skyscraper is progressing much now. The compound use that pursued a way of thinking and convenience as the wide area area as a point slightly different in these so far is it in a change in a way of thinking including making it it. In addition, the examples of the super high-rise seismic isolation increase from needs of BCP technically, too, and various things including the existing building dismantling technology come to be seen from consideration to surrounding environment.
With the appearance of these new needs, the E.E. will evolve more and more in future. I took up various superior techniques by a special feature, but there are many these techniques, and even this magazine is introduced into a current skyscraper. It may be, so to speak, said that the skyscraper is a trade fair of the state-of-the-art.
I want to introduce these introduced latest E.E. and E.E. whom introduction is expected of in future through a skyscraper.
April, 2019 issue
2019 4 issue
A special feature: Basic knowledge of a building, air conditioning, the sanitation for young electrical engineers Product number:2019年4月号 No.797 |
|
In a special feature
If building works, a part in conjunction with air conditioning, the sanitation construction do not understand those basic contents a lot so many, the electric equipment construction cannot make the electric equipment construction working drawing. In addition, I may not do well at structural outbreak, system in question, the electrical capacity and main line size, measurement, control, monitoring and settlement, scramble in some cases, and, as a result, hand return and alteration occur when the working drawing which I made, the content of the figure of boards consent are wrong. Furthermore, a problem occurs including operation, management sides and, after the building beginning to use, may be connected in giving a customer a great trouble.
By this special feature, I explained a building, air conditioning, hygiene, fire extinguishing, a summary about automatic control, the center monitoring facilities construction and contents in conjunction with the electric equipment construction for young electrical engineers and had you explain it including a drawing about a viewpoint, the various drawings' way of reading, a place to see, the point in the case to be related to electricity construction clearly.
In addition, I have wanting to hear it, feeling that I doubt, the question of wanting to know it, and a young electrical engineer explains an answer, the commentary for that in a Q&A format.
For a young electrical engineer, this special feature leads to knowledge expansion even a little and would appreciate your utilizing the use in reference materials such as the younger education.
March, 2019 issue
2019 3 issue
A special feature: High pressure tray strange electric facilities is particularly detailed Product number:2019年3月号 No.796 |
|
February, 2019 issue
2019 2 issue
A special feature: Point of the construction of the power equipment construction Product number:2019年2月号 No.795 |
|
Point of the construction of the special feature power equipment construction
―Electric power will understand the structure of necessary facilities and a point of the construction―
In a special feature
Committee member Kazuhiro Hayashi specialized in this magazine editing, Yoshiya Sakurai, Ikuya Nishio
Power equipment in the one chapter electric equipment construction
Summary of the 1-1 power equipment
Mitsubishi Jisho Sekkei vice-governor power
Summary of 1-2 air conditioning facilities
Mitsubishi Jisho Sekkei Kenichi Yasuda
Summary of the 1-3 water supply and drainage sanitation
Mitsubishi Jisho Sekkei Kenichi Yasuda
Summary of 1-4 fire extinguishing facilities (indoor fire hydrant facilities)
Nohbi Bosai Ltd. Yusuke Araki
Summary of 1-5 kitchen facilities
Cooking machine Shinichi Yasui in Japan
Two chapters conveyance facilities
The law, standard of 2-1 elevator facilities
Mitsubishi Electric Corporation Hazaka Kei ear village
Type of the 2-2 elevator
Mitsubishi Electric Corporation Hazaka Kei ear village
A design and construction of the small passenger use elevator in 2-3
Mitsubishi Electric Corporation Hazaka Kei ear village
Type of the 2-4 escalator
Mitsubishi Electric Corporation Hazaka Kei ear village
A design and construction of the 2-5 escalator
Mitsubishi Electric Corporation Hazaka Kei ear village
Elevator (English name ;dumbwaiter) facilities for exclusive use of the 2-6 parcel
Kuma Lift Yoshihiro Sakashita 74
About three chapters gondola facilities
NIHON BISOH Co., Ltd. Koki Nishimura
Four chapters mechanical parking facilities
Mitsubishi Heavy Industries machine system Nobuo Amano
Five chapters automatic door
Nabtesco Koji Kakuyama
Elevator step cancellation machine for exclusive use of the one for six chapters wheelchair
Chuo Elevator Kogyo Hideo Kasahara
The completion example introduction
Electric equipment plan of the Otemachi place (Chiyoda-ku, Tokyo)
Nihonsekkei Yoshihiro Sato, Ohbayashi Corporation Aki Nakamoto
Technical promotion
I hold a technology research presentation in Sumitomo Densetsu Co.,Ltd. 2018
Sumitomo Densetsu Co.,Ltd. Koichi Honda
I hold Nippon Densetsu Kogyo Co.,Ltd. "NDK technology development result presentation 2018"
Nippon Densetsu Kogyo Co.,Ltd.
Technical commentary
I support the spot work in remote work support system "Jiglass" (jig metal lath)
; the media work Murakami corporation that do not call for
Exhibition report
To the eco-professional 2018 "environment and society and future of the SDGs era" from an exhibition
Manabe professional engineer office Shizuo Manabe, Miyata energy Administration Office Shigekazu Miyata
Serialization
The spare time witty saying 438th design and thought
Committee member Y.M. specialized in this magazine editing
The first grade electricity construction construction management technology certification examination examination lecture
2018 subject examination questions and the commentary sixth
Committee electricity construction construction management technology certification examination examination lecture WG specialized in this magazine editing
I got a qualification in this way
―- 23 that I get the qualification even if busy
Kyudenko Corp. Yasutaka Tsuruta
Academic conference, association introduction
The first Institute of Electrical Installation Engineers of Japan
Institute of Electrical Installation Engineers of Japan Kiyoshi Morita
Look at the building walk whole country of the cultural heritage, and walk; 64
Memorial hall (propagator building) of the 100th anniversary of educational foundation Hokusei Gakuen
A.S gijutsushijimushokaku*
Essay
Is it an electric facilities memoirs 201st comic artist?
Moriyama professional engineer office Shigeru Moriyama
Starting farming for the year of electric facilities archeology grounding and the thunder protection
Is Episode 2 the existing oldest lightning rod? ... Shinagawa lighthouse ...
Nippon Chiko Takashi Shoda person
Building electric equipment data table (2) new for 2,017 years
Institute of Electrical Installation Engineers of Japan, association of NIPPON DENSETSU KOGYO
A cover photograph: Otemachi place/Nihonsekkei offer, Kawasumi, Kenji Kobayashi photograph office shooting
January, 2019 issue
2019 1 issue
A special feature: Electric construction and various analysis technology Product number:2019年1月号 No.794 |
|
December, 2018 issue
2018 12 issue
A special feature: Improvement of the spot productivity Product number:2018年12月号 No.793 |
|
November, 2018 issue
2018 11 issue
A special feature: Latest switchboard, power panel Product number:2018年11月号 No.792 |
|
October, 2018 issue
2018 10 issue
A special feature: By the specific supply and specific power transmission and distribution business supply power Product number:2018年10月号 No.791 |
|
This special feature plan has you explain the thing which performs electricity gaining over conventionally for each building, and concluded electric power companies and a receipt contract about the identification supply system that an identification electricity company supplies electricity to plural buildings using a self-management power supply via a self-management line in the large-scale redevelopment to build the plural buildings in the redevelopment area. A system of Electricity Enterprises Law accompanied with the liberalization of the electricity is revised with 2005 in 1995, 2000, and it depends on ability for power supply of the self-management power supply having been relaxed by the operational improvement of the identification supply system accompanied with the kojiene introduction promotion in 2012 by 50% or more that this system attracts attention.
When I introduce kojiene into a self-supporting power supply, I contribute to a CO2 reduction effect and energy saving measures with improvement of the generation efficiency by supplying a heat source to plural buildings with district heating and cooling facilities (DHC) using the exhaust heat.
By this plan, the phrase not to hear every day including specific supply and the specific electric company comes out, but easily explains it as it is spoken by later description in detail to deepen understanding here.
In a special feature
Committee Yukio Ichibangase, Kazuhiro Hayashi specialized in this magazine editing, Shigeyoshi Sakai
- About deregulation of the specific supply in relation to one chapter kojiene promotion
This magazine editing specialty committee Yukio Ichibangase
The current situation and the future prospects of two chapters kojiene
This magazine editing specialty committee Yukio Ichibangase
About the special dispatch of the three chapters current situation
With the special dispatch about - - power supply image
㈱Nihonsekkei Masatoshi Oba
Redevelopment examination model including the specific power transmission and distribution business
㈱Nihonsekkei Yudai Hieda
Roadmap of the redevelopment
㈱Nihonsekkei Yudai Hieda
I receive it, and strange electric facilities plans detailed
㈱Nihonsekkei Yuji Kotanino
Generator facilities plan
㈱Nihonsekkei Yuji Kotanino
Electricity monitoring control system
㈱Nihonsekkei Yuji Kotanino
Form (the supply of electric power plan to each consumer) of the self-supporting line
㈱Nihonsekkei Yasushi Ikeda
District heating and cooling (DHC) plan
㈱nichihon*keikokyomine, Kenichi Sasajima
Method to receive of the four chapters supply
㈱Nihonsekkei Yudai Hieda
Problem of the five chapters special serviceman 22kV supply of electric power and the 66kV supply of electric power
TOSHIBA infrastructure systems shokawako*
Securing of six chapters self-management line supply of electric power route
About a utility tunnel method
This magazine editing specialty committee Yukio Ichibangase
Small diameter pipe promotion method of construction
(public corporation) association of promotion technology Koji Nishiguchi in Japan
Small diameter pipe promotion method of construction supida method of construction
㈱hosho EG Naotaka Fujino
The completion example introduction
Facilities plan of the Ueno frontier tower (Taito-ku, Tokyo)
㈱Mitsubishi Jisho Sekkei Wataru Niihara, Yuko Suzuki
Mitsubishi Estate Hitomi Takeuchi
Serialization- The spare time witty saying
- Castle town Sendai of the 424th Date
- Committee J.W. specialized in this magazine editing
- 19 that I did it this way, and took a qualification
- ―I get the qualification even if busy―
- SUMITOMO DENSETSU Takeshi Tanaka
Essay- The 197th degree of risk level 3 (travel cancellation!)
- Moriyama professional engineer office Shigeru Moriyama
A cover: Mitsubishi Jisho Sekkei offer/Katsuta photograph office shooting
September, 2018 issue
2018 9 issue
A special feature: Protection and examination of the electric equipment Product number:2018年9月号 No.790 |
|
It is required that the recent high pressure facilities to receive decrease an influence accident more than now because reliability is found more. With the electric equipment that I got an electric power company distribution system and the protection cooperation to reduce an accident A certain thing is a necessary condition, and it is important that each apparatus has an appropriate protector.
When I get it for this special feature, and a strange train examines protection of providing it, I explain a system to protect, and I want to be utilized as a document having you understand the principle of the apparatus by an accident of the electric equipment and an abnormal phenomenon.
I comment on a summary and a plan about various inspection and, about an examination of various inspection, explain an introduction including a characteristic, usage of an examination, inspection instruments using a purpose, a way, a method, the inspection record of various examinations. In addition, I extract it than "the voluntary inspection and spot examination of the electric equipment" of this association issuance about the bills of the examination record and publish it.
In a special feature
- Committee Naohiro Imamura, Kaoru Igarashi specialized in this magazine editing, Jun Watanabe
- A function and role of the protection in the one chapter electric equipment
Influence on consumers from a 1-1 distribution system trouble
㈱Nikken Sekkei Mitsuo Kawai
About the setting examination example of the 1-2 overcurrent protection relay
Tokyo Electric Power power grid Yuji Takahashi, Yoshihiro Tamegai
Protection method of 1-3 facilities to receive
Mitsubishi Electric hakumori*, Masami Tahira
Examination of the two chapters electric equipment
2-1 protection relay examination
Kiriyama Electric Administration Office Shigeru Kiriyama
Examination for 2-2 record table
This magazine editing specialty committee Naohiro Imamura
Trend of a lot of 2-3 examination device
㈱MUSASHI INTEC Keiichi Irie
Serialization- The spare time witty saying
- It is nothing new to say it is a human trunk the 423rd
- Committee H.I. specialized in this magazine editing
- 18 that I did it this way, and took a qualification
- ―I get the qualification even if busy―
- Sanki Engineering Kazumasa Murayama
Essay- Electric facilities memoirs 196th recollection
- Moriyama professional engineer office Shigeru Moriyama
A cover: Kiriyama Electric Administration Office offer
August, 2018 issue
2018 8 issue
A special feature: JECA FAIR 2018 66th electric facilities industry exhibition A special feature: The electric equipment which supports life infrastructure Product number:2018年8月号 No.789 |
|
The information of the earthquake occurrence comes to become available in each place after this year began, and probability of the outbreak of the large-scale earthquake in the Pacific coast area increases in the next 30 years. In such tendency of the times, the interest increases without Yes and No about bread and butter facilities surrounding us.
By this special feature, I introduce the structure and an electric equipment-related technique to be related about facilities supporting bread and butter, life infrastructure.
Preface Committee chief examiner Kazuhiro Hayashi specialized in this magazine editing
This magazine editing specialty committee Ikuya Nishio, Seiichi Kinoshita, Shinsuke Suzuki
Fuji electric wire Kawada justice, Hideaki Okazaki
Fujikura Dia Cable Atsuhiko Niwa, Hidekiyo Fujii
TFF furuku company Eiji Takahashi
July, 2018 issue
July, 2018 issue
A special feature: Knowledge and FAQ of the grounding Product number:2018年7月号 No.788 |
|
A special feature of "the Q&A of the thunder protection systems construction" is made in this magazine November, 2016 issue. I collected the matters which the person in charge was usually troubled with and arranged the article as "a question" and it got "the answer" by the expert of the thunder protection and gathered it up. I collected matters to be usually troubled with and, in "the knowledge and the FAQ of the grounding of this special feature," gathered it up by "a question" and "an answer".
The grounding is an electric circuit connecting with the earth, and it is in the route where the ground electric current flows in. There are usually 0 (zero) units, and that is why I am used for securing of stability of the circuit voltage, and stability of the operation such as apparatuses is kept and should minimize the risk to the human body, but may not keep soundness you do what kind of connection (shape) on what kind of earth (the earth specific resistance) at this time, or what kind of state (separation distance) you connect it in.
In addition, I think that I become a cause to be able to trouble a designer and a builder in thinking about soundness because a combination of grounding construction includes various cases.
I want to have you understand this cause to be able to trouble it through FAQ by this special feature. In addition, I kept a commentary as a minimum as constitution and collected the FAQ about various matters and I had various reply and made it.
Committee Seiichi Kinoshita, Kazuhiro Hayashi specialized in this magazine editing, Yukio Ichibangase
About a 1-1 electric equipment technology standard, interpretive grounding
Ministry of Economy, Trade and Industry Takatoshi Oikawa
Point in a design, the construction according to the 1-2 use
This magazine editing specialty committee Seiichi Kinoshita
<office> about the grounding in the office
This magazine editing specialty committee Seiichi Kinoshita
<hospital> The way of a power supply, the grounding facilities for microelectronic equipments
ea water disaster prevention Masami Okumura
<hall studio> about the grounding in the hall studio
KAJIMA CORPORATION Ken Uemura
<datacenter> about grounding in the datacenter
FUJITSU Yoshitaka Yamaguchi
<factory> About the grounding in the factory
Geological feature environment technical center company Satoru Shiga
Point in a design, the construction according to the 1-3 construction
<rack facilities> of the cable rack about electrically connecting it
Negros electrical industry㈱
<explosion-proof facilities> grounding (essence security explosion protection structure) of the explosion-proof electric equipment
(one) NEC control equipment industry society Tetsuya Yoshizaki
<lightning equipment> about grounding in the lightning equipment
Geological feature environment technical center company Satoru Shiga
<grounding pole facilities> about the grounding in grounding pole facilities
Nippon Chiko Takashi Shoda person
FAQ about the two chapters grounding
2-1 law, standard
Geological feature environment technical center company Satoru Shiga, nichihondaigaku*den*fu,
TOKYO ELECTRIC POWER SERVICES Sayuri Takasu, sankoshiya Masaaki Sato,
Nippon Chiko Takashi Shoda person
2-2 materials
(one) Association of electrical power cable connection technology technology in Japan, Committee on Environment,
Nippon Chiko Takashi Shoda person, Watabe industry Ebata one,
Panasonic switch gear systems Masahiko Kagawa,
MIDORI ANZEN Co., Ltd. 德kyobo
2-3 construction
Nippon Chiko Takashi Shoda person, geological feature environment technical center company Satoru Shiga
2-4 and others
Geological feature environment technical center company Satoru Shiga, association of Japan ship electric equipment Tamaki chapter
-
- Committee T.S. specialized in this magazine editing
- 16 that I did it this way, and took a qualification
- ―I get the qualification even if busy―
- ㈱sekidenkohantsukayokai*
Essay- Electric facilities memoirs 194th harassment
- Moriyama professional engineer office Shigeru Moriyama
A cover: Nihonsekkei (an offer: modern architecture Corporation)
June, 2018 issue
June, 2018 issue
A special feature: An accident example of the electric equipment and the preventive measures Product number:2018年6月号 No.787 |
|
Possibility to become the electric shock casualties disaster is very high in the accident of the electric equipment. In addition, in the hospital facilities, an operation error of one breaker might take human life. In the high information-oriented society, the blackout that occurred from an electric accident triggers it, and a vast economic loss including a data loss and the communication block may occur. By this special feature, I want to expect the consciousness improvement of the electric equipment engineer by knowing the measures from an accident example to occur with an accident and an apparatus (haifundembanto) due to natural environments.
This magazine editing specialty committee Hiroki Ikeda, Yukio Ichibangase, Ikuya Nishio
Ministry of Economy, Trade and Industry Kanto Tohoku industry preservation supervision department electricity security section
2.Deficient example of the grounding construction
Nippon Chiko Takashi Shoda person
3.Accident measures example of the switchboard
㈱Kokubun Electric Shigeru Terakado
4.About knowledge and a check method to prevent an accident
(public corporation) Association of Tokyo Electric management engineer publication Committee
5.Water Tolly measures by the live wire diagnosis
(one) Japan Electric Wire & Cable Marker's Association Yoji Koike
6.An accident example and measures of generation facilities
(one) Internal combustion power generation facilities association Akira Numata in Japan
7.Maintenance and measurement of the PV system
HIOKI E.E. Masao Higuchi
8.Making example of an investigation in the repair work and the plan
Toko Electrical Construction Tsuyoshi Shimazaki
9.About the safe measures articles such as the insulation protective gears
yotsugi Kishida existence law of nature
10. Trend of a switchboard, the panel
About the panel using the 10-1 push in method terminal stand
(one) Supply of electric power control system industry society River Yutaka Haraki in Japan
Force of "the zero screw ™ terminal stand" to solve the problem of the 10-2 construction site
HIROSE ELECTRIC Teppei Komatsu
April, 2018 issue
April, 2018 issue
A special feature: Storage technology of the electricity energy Product number:2018年4月号 No.785 |
|
Quantity of generation of the renewable energy increases, but the quantity of generation is unstable. Therefore large-scale accumulation of electricity facilities are considered for stabilization when I connect renewable energy to an electric power system.
On the other hand, as for the electricity contract, it is thought that the electricity storage technology becomes more and more important by night by the spread, promotion of electricity rate type demandodesuponsu, contract electricity reduction (peak cut), "the promotion of the equalization of the electric demand" of the energy saving method when I think at a building level although it is abolished. Not the stability of the electric power system, I have you comment on the facilities which you can adopt as building facilities this time.
本誌編集専門委員 村田 美久、今村 直大、酒井 重嘉
1.高調波とは
1-1 スイッチング波形のフーリエ級数表現
本誌編集専門委員 村田 美久
1-2 直列リアクトル6%と13%の違い
㈱指月電機製作所 片岡 義則
1-3 高調波の分流モデル 本誌編集専門委員 村田 美久
1-4 高調波の最近の傾向(障害発生事例)
日新電機㈱ 長崎 則久
2.高調波流出電流計算書(その1)の仕組み
本誌編集専門委員 村田 美久
3.高調波流出電流計算書(その2)の仕組み
3-1 高調波流出電流の詳細計算と対策要判定時の追加対策
㈱指月電機製作所 片岡 義則、田丸 裕也、岡田 拓也
3-2 対策要判定の場合の追加対策2
住友電設㈱ 吉田 裕一
3-3 対策要判定の場合の追加対策3
住友電設㈱ 吉田 裕一
4.構内進相コンデンサ設備への高調波流入量の検討
4-1 進相コンデンサ設備の高調波耐量規格
資料提供:ニチコン㈱
4-2 進相コンデンサ設備への高調波流入量の計算
住友電設㈱ 吉田 裕一
4-3 耐量を超えた場合の進相コンデンサ設備の選定
㈱関電工 坂本 英雄
5.高調波監視機器および測定器
㈱きんでん 石松 康治
March, 2018 issue
March, 2018 issue
": business of the harmonics II - report a special feature" Product number:2018年3月号 No.784 |
|
The special feature called harmonics outflow calculation and yard measures" is made in this magazine September, 2015 issue. Therefore "the point of the revision, a circuit classification and a conversion factor, the greatest rate of operation, the correction coefficient by the scale of the building, the commentary of the check and yard problem and measures are included in contents by the process of the first edition establishment of the harmonics restraint measures technique guideline (JEAG 9702). But it is commentary-like contents and may be puzzled when I apply it in the real spot only by reading. Therefore I included calculation examples in the material as the practice-like contents which could perform a more practical report with the actual situation of the harmonics failure by the influence this time after having let the reader of the young person engineer be conscious of the need of the measures. It is said to have a young person engineer understand the mechanism of the calculation based on a concrete number about the commentary quantity of 1-generating of the check of the special feature, a 2-measures part in the last time.
In addition, I sell it about the reason and measures because the issue of harmonics may occur in the yard when I meet the standard of the harmonics spillage.
This magazine editing specialty committee Miku Murata, Naohiro Imamura, Shigeyoshi Sakai
1.With the harmonics
Fourier series expression of the 1-1 switching wave pattern
This magazine editing specialty committee Miku Murata
Difference of 6% of 1-2 series reactive coil and 13%
㈱SHIZUKI ELECTRIC Yoshinori Kataoka
Arm of a river model this magazine editing specialty committee Miku Murata of 1-3 harmonics
Recent tendency (obstacle outbreak example) of 1-4 harmonics
Nissin Electric Norihisa Nagasaki
2.Structure of the harmonics outflow electric current check (1)
This magazine editing specialty committee Miku Murata
3.Structure of the harmonics outflow electric current check (2)
The detailed calculation of the 3-1 harmonics outflow electric current and additional measures at the time of the measures judgment required
㈱SHIZUKI ELECTRIC Yoshinori Kataoka, Yuya Tamaru, Takuya Okada
Addition measures 2 in case of the 3-2 measures judgment required
SUMITOMO DENSETSU Yuichi Yoshida
Addition measures 3 in case of the 3-3 measures judgment required
SUMITOMO DENSETSU Yuichi Yoshida
4.Examination of the harmonics inflow to kamaenaisusumiso condenser facilities
Harmonics dosis tolerata standard of 4-1 susumiso condenser facilities
A document offer: NICHICON㈱
Calculation of the harmonics inflow to 4-2 susumiso condenser facilities
SUMITOMO DENSETSU Yuichi Yoshida
The choice of susumiso condenser facilities when I surpassed 4-3 dosis tolerata
㈱KANDENKO Hideo Sakamoto
5.Harmonics monitoring apparatus and measuring instrument
㈱KINDEN Koji Ishimatsu