Administration information 2018
March, 2019
February, 2019
January, 2019
December, 2018
November, 2018
October, 2018
September, 2018
August, 2018
About adequacy of the August 3, 2018 subcontract and subcontract price payment and thorough construction management [the Ministry of Land, Infrastructure, Transport and Tourism]
About a notice matter when deal with public construction design labor unit price as reference materials in determination of subcontract price on August 1, 2018 (the Ministry of Land, Infrastructure, Transport and Tourism)July, 2018
June, 2018
May, 2018
April, 2018
March, 2018
About promotion of the way of working reform of the 2018-03-22 construction industry (the Ministry of Land, Infrastructure, Transport and Tourism)
About the authorization to the requirements of the chief engineer of the 2018-03-22 registration nucleus skill person (the Ministry of Land, Infrastructure, Transport and Tourism)
About a cooperation request to affect the promotion of safe hygiene measures in the construction industry of 2018-03-15 2018 (Ministry of Health, Labour and Welfare)
About thorough preventive measures against healthy obstacles of the worker based on the 2018-03-06 risk evaluation result (Ministry of Health, Labour and Welfare)
About the enforcement of the 2018-03-05 "STOP! heat stroke cool work campaign" (Ministry of Health, Labour and Welfare)
About the adoption selection that 2018-03-01 is fair (Ministry of Health, Labour and Welfare)